Synthetic data. Illustrative policy. Not Nestlé data.
Recorded model · replay
MT
Minh Tran · fictional
FIN-1 / Import & classify

Import and classify cost lines

Import SAP cost lines, classify each with a reason, and send it for controller sign-off.

Book 01 (group, NAS) / Book 10 (local, VAS) · book mapping to confirm with Nestlé · Policy sample-2026-11-22-v2, effective 2026-11-22

First-pass exact classification
88.4%191/216 · synthetic set
Rule 38.9% · 43/216 routed to a person (19.9%)
Later lines / correction replay
88.2% 95.8%
138/144 later lines after correction · same denominator before
Project cost imported
n/a
0 cost lines · 4 assets · VN-LT
Controller attention
n/a
Import and classify to open the queue
Monthly control flags
n/a
Explained checks · linked source evidence

Source file

SAP export today, connector in the pilot.

Step 01

Import this month’s SAP export.

The sample holds PO items, account assignments, goods receipts and invoice status. It is a bilingual synthetic file with the same details a controller needs.

Get sample JSONSAP-style CSV
Inspect source fields and SAP mapping

Synthetic joined SAP-style export, not a native SAP extract or live connector. External POSID WBS codes are resolved from the internal account-assignment key. Friendly JSON names are normalised for the demo.

Friendly fieldTechnical fieldObject
Purchase orderEBELNEKKO/EKPO
PO itemEBELPEKPO
Item short text (40 characters)TXZ01EKPO
PO item long textPO_LONG_TEXTPO text extract
Vendor (fictional name)VENDOR_NAMEVendor joined display
Material group (illustrative)MATKLEKPO
Net value VNDNETWREKPO
CurrencyWAERSEKKO
Plant (fictional)WERKSEKPO/PRPS
PO document dateBEDATEKKO
External WBS element codePOSIDPRPS joined to EKKN
Account assignment category / WBSKNTTPEKPO/EKKN display
Goods receipt material documentMBLNREKBE/MSEG
GR posting dateBUDATMaterial document
Responsible cost centre (fictional)KOSTLPRPS/ANLZ
Joined invoice statusINVOICE_STATUSDerived extract field
Proposed demo asset receiverPROPOSED_ASSETDemo preparation field
Synthetic line referenceDEMO_LINE_IDDemo preparation field

Interactive import accepts the normalised JSON. CSV is a reference export; a pilot adds the approved extract mapping.

1Import source2Classify by policy3Controller sign-off
Import the file before running classification.

Three fictional factory projects

WBS hierarchies · 12 proposed assets · VND

Lotus packaging line

VN.26.PKG · VN-LT

72 cost lines

16.50bn

VND

River wastewater upgrade

VN.26.WWT · VN-RV

72 cost lines

16.51bn

VND

Meadow warehouse extension

VN.26.WH · VN-MD

72 cost lines

16.52bn

VND

Mixed Vietnamese and English, abbreviated text, bundled purchases and vague descriptions are deliberate review cases.

Measured, with the misses included.

Exact match on category, capex/expense/split/review treatment, group book and local book. All imported seed lines are in the denominator; missing output is incorrect. Correct review routes count as policy decisions; this is not an approval-automation rate.

Synthetic benchmark

216 cost lines · 72 authored scenario families · at most 3 variants per family · 72 lines with long text · 5 predefined site conventions withheld at first pass. Labels were written before model recording and stay fixed.

Recorded model / first pass88.4% (191/216)
Rule-only baseline38.9%
Held-out first pass / same later lines88.2%
After scripted corrections / same later lines95.8%

Fixed seed order: first 72/216 lines (one third, rounded down) supply scripted category/treatment corrections. Corrections propagate by description/vendor/material-group similarity to specific pending lines only. Vague raw source text never teaches another line; vague targets and bundled/split targets never inherit a proposal. A specific purchased item may inherit a supported controller correction even if the model previously abstained; vendor, material group and normalised description or part-code family determine similarity. Explicit manual corrections remain protected. Score only the remaining 144 later lines; their hidden labels are never used for teaching. Compare this held-out score with the full-set first pass cautiously because denominators differ. The heldOutFirstPass field uses the same held-out denominator. Rule fallback outputs count as unavailable model outputs, never correct model predictions. No label-derived tuning.

Policy: sample-2026-11-22-v2 · effective 2026-11-22
Recorded model: gpt-6.1-sol
Measured: 2026-11-22T09:32:13.028Z
Reproduce: pnpm measure

Source languageCorrect / totalModelRule only
English64 / 7783.1%35.1%
Vietnamese42 / 4887.5%41.7%
Mixed85 / 9193.4%40.7%
Difficulty tierCorrect / totalModelRule only
Clear140/14199.3%44.7%
Ambiguous51/6085.0%35.0%
Site convention0/150.0%0.0%

Person routing: 43/216 (19.9%). Abstentions: 29. A correct review route counts as a policy decision, not an approved asset.

This is a small generated sample under an illustrative policy. It is not a NAS accuracy claim or evidence of performance on factory data.
Inspect category accuracy, confusion and first-pass misses (25)
Ground-truth categoryCorrectModelRule only
Machinery51/5789.5%36.8%
Buildings29/3387.9%30.3%
Utilities29/3096.7%40.0%
Software15/1883.3%44.4%
Expense36/3992.3%38.5%
Shared costs20/2483.3%45.8%
Unresolved11/1573.3%46.7%
Expected: Buildings / capex / capex / capex
Model: Utilities / capex / capex / capex
Expected: Unresolved / review / review / review
Model: Utilities / capex / capex / capex
Expected: Utilities / capex / capex / capex
Model: Machinery / capex / capex / capex
Expected: Shared costs / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Expense / expense / expense / expense
Model: Unresolved / review / review / review
Expected: Software / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Buildings / capex / capex / capex
Model: Utilities / capex / capex / capex
Expected: Unresolved / review / review / review
Model: Utilities / capex / capex / capex
Expected: Buildings / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Unresolved / split / review / review
Model: Unresolved / review / review / review
Expected: Shared costs / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Expense / expense / expense / expense
Model: Unresolved / review / review / review
Expected: Software / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Buildings / capex / capex / capex
Model: Utilities / capex / capex / capex
Expected: Shared costs / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Unresolved / review / review / review
Model: Utilities / capex / capex / capex
Expected: Shared costs / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Expense / expense / expense / expense
Model: Unresolved / review / review / review
Expected: Software / capex / capex / capex
Model: Unresolved / review / review / review
Expected: Machinery / capex / capex / capex
Model: Unresolved / review / review / review

Category confusion: true category → proposed category (count)

Machinery → Machinery51
Machinery → Unresolved6
Buildings → Buildings29
Buildings → Utilities3
Buildings → Unresolved1
Utilities → Utilities29
Utilities → Machinery1
Software → Software15
Software → Unresolved3
Expense → Expense36
Expense → Unresolved3
Shared costs → Shared costs20
Shared costs → Unresolved4
Unresolved → Utilities3
Unresolved → Unresolved12